
Every
roll manufactured
undergoes a range
of tests during
manufacture. On
all of the metallising
machines measurement
of the Aluminium
thickness is measured
by a monitor across
the width of the
film.This measurement
is fed back to the
boat and wire rate
settings which are
automatically controlled
to ensure an even
deposition within
the specification
limits is maintained
throughout the roll.
The in
line deposition
measurements are
verified by manual
measurements on
samples taken off
the roll after metallising
and slitting.The
metallised samples
are retained with
the final reel Quality
sheet.Each off line
monitor has a calibration
maintained using
certified calibration
slides to ensure
accurate measurement
of optical density
is produced.
Every
input roll into
the plant is issued
with a Quality Reel
Report Sheet. This
remains with the
roll throughout
all stages of production.Items
that are recorded
on this sheet include
Supplier Reel Number,Input
Weight,Ultimet Reel
Number, Roll Hardness,
Output Weights,Output
Lengths, Metal Adhesion,
Roll Temperature
and Optical Density.The
metallised sample
and suppler reel
labels are stored
with these sheets
for a period of
three years.
One of
the biggest areas
of waste and customer
complaint on films
is associated with
winding quality.This
is minimized at
Ultimet due to stringent
setting of Process
Operating Conditions
within the machine
process control
computers. Correct
tension levels for
a given width are
automatically calculated
by the product menu.
This coupled with
automatic tension
control from the
load cells and drives
ensure that winding
complaints are minimal.
|